The Panama Canal Authority announced an immediate expansion of Panama Canal capacity on November 10, 2026, adding a new daily reservation slot for Super category vessels in the Panamax locks. The adjustment raises total daily transits from 33 to 34, with 24 slots now allocated to Panamax locks and 10 to Neopanamax locks.
The change takes effect for reservation dates beginning November 12, 2026. Shipping companies will gain access to the additional slot through the regular reservation system, with initial allocations handled via auction periods before transitioning to standard competition windows later in the month.
Panama Canal Capacity Boost Follows Improved Water Conditions
Officials attributed the expanded Panama Canal capacity to favorable hydrological projections and rising water levels in Gatun and Alhajuela lakes, the primary reservoirs feeding the interoceanic waterway. The authority also raised the maximum authorized draft for Neopanamax vessels to 15.24 meters (50 feet) effective November 9, 2026, a level that remains in effect until further notice.
Administrator Ilya Espino de Marotta said water conservation measures at the locks now save roughly 1.2 billion liters daily. “In comparison with 2024, we have significantly improved our operational measures to save water. This has allowed us to considerably reduce the impact on maritime transport,” she stated [Translated from Spanish].

Reservation System and Operational Timeline
The new Super category slot will be distributed through three phases. For reservation dates between November 12 and 17, the space opens through Period 3 auctions. Dates from November 18 to 23 will use Period 2 special competition. Starting November 24, the slot integrates into the regular opening of the Second Competition Period.
The Canal reminded clients that the Transit Reservation System remains the only mechanism guaranteeing a specific passage date. Vessels without reservations may face significantly longer waiting times.
The Panama Canal has raised its daily transit capacity to 34 vessels and increased the maximum allowable draft for neopanamax ships to 50 ft #PanamaCanal #PanamaCanalAuthority #Shipping #GlobalTrade #MaritimeTransport #InternationalTrade #RobbanAssafina https://t.co/VfaXouvGr2
— Robban Assafina (@robbanassafina) November 11, 2026
Long-Term Water Security and the Rio Indio Reservoir
Espino de Marotta projected the highest water stress period will occur between February and May 2027. The fiscal year 2027 budget anticipates this scenario with a projection of 10,750 high-draft vessel transits.
The administrator emphasized that the Rio Indio reservoir project represents the long-term solution to the Canal’s water challenges. Once completed, it will sustain 36 daily transits at a 50-foot draft while guaranteeing potable water for more than half of Panama’s population. Physical construction is expected to begin in 2028, with the reservoir operational by 2032.
“This lake will guarantee that we can carry out both activities without one affecting the other: maintain between 36 and 40 daily transits and supply drinking water to the population,” she said [Translated from Spanish].
The authority maintains continuous monitoring of watershed conditions and lake levels to make timely adjustments that protect the reliability and competitiveness of one of the world’s principal maritime trade routes.

